The main entrance to the site is designed from the eastern side of the existing driveway. At the entrance, a temporary parking lot is planned for passenger cars and an economic block, which consists of security premises, utility rooms, a boiler room, and a covered area for the potential installation of a diesel generator. From the side of the existing driveway, a second technical entrance is provided for servicing purification facilities and waste removal. Access for firefighting equipment to the site is planned via a driveway with gravel covering, with the organization of a turning area near the proposed building.